The National Aeronautics and Space Administration (NASA) began fueling its new moon rocket early Monday for liftoff on a test flight to put a crew capsule into lunar orbit for the first time in 50 years.
Thunderstorms delayed the fueling operation by an hour. The threat of lightning diminished enough to allow the launch team to proceed with loading the rocket’s tanks. But it was uncertain how much the stalled work might shorten the two-hour launch window, reports AP.
No one was inside the Orion capsule atop the 322-foot (98-meter) rocket at Kennedy Space Center. Instead, three test dummies were strapped in for the lunar-orbiting mission.
It’s the most powerful rocket ever built by NASA, out-muscling the Saturn V that carried astronauts to the moon a half-century ago.
Thousands of people jammed the coast to see the Space Launch System, or SLS, rocket soar.
Bd-pratidin English/Golam Rosul